As part of the Alameda Corridor Transportation Authority Expressway Project in Long Beach, California, Geospatial Holdings has been contracted to map a high pressure gas line.
A project proposing to replace the seismically deficient Schuyler Heim Bridge over Cerritos Channel in Long Beach has recently engaged the utilisation of Geospatial’s Smart Probe Pipeline Mapping
Technology System.
Approximately 2,600 lineal feet of existing high pressure gas pipeline installed over 90 feet in depth and 12 inches in diameter will need to be accurately located and mapped, as the overall project requires pilings to be driven in the area of the pipeline.